Contact Us
留下(xià)您的(de)信息

Shanghai Qiantan Center roof curtain wall hoisting machine

2024-12-27
Picture 20
Picture 21

Shanghai Qiantan Tower Crown Curtain Wall Hoisting Equipment
Traveling fixed cantilever hoisting construction equipment ε(hereinafter referred to as crane 1)
Traveling lifting cantilever hoisting construction equipment (hereinafter referred to as crane 2)

The Shanghai Qiantan project is located at 1/26 of Block 107, S≠anlin Town, Pudong New District, Shanghai. It is bounded by Dongyu Road in the east, Yang>si West Road in the west, Haiyang West Road in the south, and P®lot 25-01 in the north. The total construction areαa is more than 191,700 square meters. The number of floors and height of the building€: 56 floors above ground and 3 floors underground; the maximum elevation of the curtain wal l is 279.85 meters. Reinforced concrete frame-reinforced concrete core tube. The building funct¥ion is high-end office space.

After the main structure of the Shanghai Qiantan project was εcapped, the curtain wall installation began. The curtain wall installation requires the use of  crane equipment. Our company provides lifting equipment to cooperate  with the curtain wall installation. Our company has a total★ of 2 cranes, which are installed on the I-beam guide↓ rails of the tower crown at the top of the tower. The rails are arranged along the edge of th→e tower crown to form a closed circle. One is responsible for hλanging the curtain wall; the other is equipped with a hanging basket, and the operator i<nstalls the curtain wall in the hanging basket. The two cranes are used together to complete theε curtain wall installation.

Our company's main completed work includes:
■ 2 different crane designs;
■ Manufacturing of 2 different cranes;
■ Installation and commissioning of 2 different cranes;♦
■ Operation and maintenance of 2 different cranes.